Home
Versión Español

Success Stories
 
2008. Design, supply, construction, testing and startup of electrical system at the General Motors complex in San Luis Potosi, S.L.P., Mexico

2008. Design, supply, construction, testing and startup of a 115/13.8KV. 45/60MVA elevating electrical substation for the Procter & Gamble plant in Apizaco, Tlaxcala, Mexico.

2007. Detail engineering, supply, installation, startup and commissioning of the lighting and power equipment and electrical system for the Taylor Farms de Mexico plant in San Miguel de Allende, Guanajuato, Mexico.

2007. Design, supply, construction, testing and startup of a 115/13.8 KV reducing electrical substation with a Prolec-GE brand 15/20 MVA transformer, for Tuberías Procarsa, S.A. de C.V., in Monclova, Coahuila, Mexico.

2006. Construction of the 400 KV transmission line from the Substation Plaza to the Substation Tec for the NOINE Project, for Iberinco / CFE.

2005. Design and construction of the main 230-13.8 KV substation for the “Milpillas” project in Cananea, Son. for PEÑOLES, S.A.

2005. Design, construction and testing of a 115 KV underground line for Servicios de Agua y Drenaje de Monterrey.

2003. A 115-13.8 KV, 12/16/20 MVA reducer substation and y connection of 115 KV, for the "GUIDE" plant in Apodaca, N.L.

2002.
Substation design and construction of 115 KV lines for interconnection to the CFE from the Tractabel power plant.
 
2002. Turnkey project for 4 GIS-type substations and the electric ring in Monterrey for customers of Iberdrola Energía Monterrey.

1997.Design and construction of the main substation and 115 KV subtransfer ring for the Enertek plant in Altamira, Tamaulipas.

1996. Design and construction of lines and a 90 MVA substation and 13.8 KV medium tension line in Valle Oriente, San Pedro Garza García, N.L.

1993. Construction and startup of a 375 MVA 400-230 KV substation for HYLSA, in Monterrey, N.L.

1993. Complete high, medium and low tension electrical infrastructure for General Motors, in Silao, Guanajuato.

1990. Construction and startup of a 40 MVA 230-4.16 KV substation for the Cementos Apasco plant in Ramos Arizpe, Coahuila.

1988. Design and construction of a 115-13.8 KV substation for Nylon de México, in San Pedro Garza García, N.L.

1984. Design and construction of a 100 MVA substation for Rimir (General Motors) in Matamoros, Tamaulipas.

1983.
Construction and startup of a 75 MVA 230-13.8 KV substation for the AHMSA plant in Hércules, Coahuila.

Voltrak © 2008