2011. Arena Ciudad de México.
Power Systems Construction
2011. Perfiles Comerciales SIGOSA.
Construction of Power Substation, Feeders and Transmission Line; all at 230 kV
2011. DEMEK / Pirelli.
Design, Procurement, Construction, Testing and Commissioning of a Step-Down Electric Substation at 115 kV / 34.5 kV; including 30 MVA transformers. Silao, Guanajuato
2010. Comisión Federal de Electricidad.
Construction of two High Voltage Transmission Lines at 115 kV and one Substation at 115 kV
2010. Comisión Federal de Electricidad.
Contruction of an Electrical Substation in Cuautla, Morelos (PIF 1212)
2010. Compañía de Energía Mexicana.
Design, Procurement (partial), Construction, Testing and Commissioning (partial) of a Step-Up Electrical Substation 115 kV / 13.8 kV - 12/16/20/22.4 MVA.
2009. Denso de México, S.A. de C.V.
Design, construction and startup of a 115KV-13.8KV, 5/6.25 MVA substation for Denso de México, S.A. de C.V. in Guadalupe, Nuevo León.
2009. Flex America, S.A. de C.V.
Design, equipment supply, construction, test and startup of a 115-13.8KV,12/16/20MVA substation for flex America, S.A. de C.V. in Altamira, Tamaulipas.
2008. Design, supply, construction, testing and startup of electrical system at the General Motors complex in San Luis Potosi, S.L.P., Mexico.
2008. Design, supply, construction, testing and startup of a 115/13.8KV. 45/60MVA elevating electrical substation for the Procter & Gamble plant in Apizaco, Tlaxcala, Mexico.
2007. Detail engineering, supply, installation, startup and commissioning of the lighting and power equipment and electrical system for the Taylor Farms de Mexico plant in San Miguel de Allende, Guanajuato, Mexico.
2007. Design, supply, construction, testing and startup of a 115/13.8 KV reducing electrical substation with a Prolec-GE brand 15/20 MVA transformer, for Tuberías Procarsa, S.A. de C.V., in Monclova, Coahuila, Mexico.
2006. Construction of the 400 KV transmission line from the Substation Plaza to the Substation Tec for the NOINE Project, for Iberinco / CFE.
2005. Design and construction of the main 230-13.8 KV substation for the “Milpillas” project in Cananea, Son. for PEÑOLES, S.A.
2005. Design, construction and testing of a 115 KV underground line for Servicios de Agua y Drenaje de Monterrey.
2003. A 115-13.8 KV, 12/16/20 MVA reducer substation and y connection of 115 KV, for the "GUIDE" plant in Apodaca, N.L.
2002. Substation design and construction of 115 KV lines for interconnection to the CFE from the Tractabel power plant.